Genelba Plus
"Genelba Plus" leads you to giving a walk along Genelba Plus's Thermal Power Plant, project realized in Argentina from 2008 to 2010 by Duro Felguera as main EPC contractor.
The first stage of Genelba Plus was the construction of an open cycle Power Plant capable of producing 169MW through a gas turbine manufactured by Siemens. I was lucky to work as a site manager on this project.
Between 2018 and 2020 Genelba Plus is being expanded to become a 2x1 combined cycle (2 gas turbines + 1 steam turbine), being able to produce 552MW under this configuration.
Genelba Plus Book
See the complete book // Ver libro completo.